Performance Metrics
Injection Efficiency: Achieves high water injection rates, typically ranging from 10,000 to 150,000 barrels per day (BPD), optimising reservoir pressure maintenance and enhancing oil recovery.
Pressure Control: Designed to operate under various injection pressures, typically up to 300 bar, ensuring precise control over injection rates to maximise sweep efficiency and minimise the risk of reservoir damage.
Water Quality Management: Ensures consistent water quality with filtration and treatment systems capable of reducing suspended solids to below 2 microns, preventing formation plugging and enhancing injectivity.
Operational Uptime: Engineered for continuous operation with over 98% uptime, minimising downtime and ensuring sustained reservoir pressure to support ongoing production activities.